House Progress (Jul/Aug 2007)
achs5_01.jpg
Imported Canadian Dyar wood arrives at the new home. This old man put this very heavy wood inside. We paid him extra for his efforts
achs5_02.jpg
Might have paid the donkey some extra too for his hard work. A fresh hay stack maybe
achs5_03.jpg
Got to learn a lot about good wood. As you can see there are no 'Gaanths' on this wood. Its those circular patterns on wood. This assures that the wood is strong. Also the wood should not be too soft or too hard. This wood is also chemically treated against termites and wet weather
achs5_04.jpg
Wood placed inside the house
achs5_05.jpg
Wood from another angle
achs5_06.jpg
Bathroom floor has been tiled
achs5_07.jpg
Our 6 jet jaccuzi bath
achs5_08.jpg
The small wicket gate has been erected too
achs5_09.jpg
Sheets of solid wood arriving. These will be used to make doors
achs5_10.jpg
Saba at the main door
achs5_11.jpg
View of house facet with Saba leaning
achs5_12.jpg
Saba by the main gate
achs5_13.jpg
View of the house
achs5_14.jpg
Door was locked so I had to climb the wall and jump in
achs5_15.jpg
It was raining too
achs5_16.jpg
The structure for the big sliding windows is in place on which the glasswork and grills will be erected
achs5_17.jpg
View from the kitchen window
achs5_18.jpg
The activity/drawing/dinig room where the sample grill is placed. This is also where the wood work is being done
achs5_19.jpg
Saba resting on the charpai in lounge
achs5_20.jpg
Umer inspecting stuff in the lounge
achs5_21.jpg
The lobby area and the stairs to upper story. Sample door is placed
achs5_22.jpg
This is how doors will look like. This is a very raw form. It also matches our main gate
achs5_23.jpg
Work is almost done. I am happy!